Health Care

Project Name : Geisinger Wyoming Valley Cancer Center
Project Location : Wilkes Barre, PA

Project Description : Served as an MEP sub-consultant for cancer Clinic 11,400 square feet.
Construction Complete : May 1994
MEP Construction Cost : $1,450,000
Award : Energy design award for new building construction - 1994

 


Project Name : Shamokin Area Community Hospital – OR Wing Addition
Project Location : Shamokin, PA

Project Description : Served as Mechanical, Plumbing, and Fire Protection Engineers for a three story addition to the Shamokin Area Community Hospital. The addition will house new operating rooms, endoscopy rooms, labs, and patient rooms.
Design Complete : May 2002
Architect : Burkavage Design Associates

 

Project Name : Geisinger Medical Group – New Lewistown Clinic
Project Location : Lewistown, PA

Project Description : Provided MEP & FP design services for a new two-story, 40,000 square foot Clinic. The Clinic included, an X-Ray suite, Chemotherapy Treatment Rooms, an Ophthalmology Suite, 50 exam rooms, treatment and minor procedure rooms, an In-House Pharmacy, and offices. The mechanical design included water source heat pumps with a closed circuit fluid cooler and gas-fired boilers. The building is fully-sprinklered. Electrical design included lighting, normal and emergency power distribution, fire alarm, security, nurse call, and site lighting.
Construction Complete : October 2002
Architect : John C. Haas Associates, Inc.

 

 

Project Name : Community Medical Center – Additions and Renovations
Project Location : Scranton, PA

Project Description : Served as MEP consulting engineer for 40,000 square foot of additions and 20,000 of renovations to the Community Medical Center in Scranton. The project included additions and renovation to the Emergency Department, Labs, Medical Records, and Diagnostic Treatment.
Design Complete : May 2003
Total Construction Cost : $10,000,000
Architect : Burkavage Design Associates

 

Project Name : Geisinger Wyoming Valley- Obstetric Suite Renovations
Project Location : Wilkes-Barre, PA

Project Description : Served as Mechanical, Electrical, Plumbing, and Fire Protection Engineers for additions and alterations to the Obstetrics Suite at Geisinger Wyoming Valley. The project included new cesarean section delivery rooms, locker rooms, and post-procedure holding rooms, renovations to the existing nursery, nurse stations, LDRPS, and related spaces. The Project included extensive modifications and relocations of the existing hospital electrical and plumbing utilities.
Design Complete : February 2003
Total Construction Cost : $3,100,000
Architect : Hiller Speser Associates


Project Name :
Penn State College of Medicine- Hershey Medical Center
Project Location
: Microbiology Lab Renovations Hershey, PA

Project Description : Served as Mechanical, Electrical, Plumbing, and Fire Protection Engineers for renovations to Biomedical Research Labs for the Penn State College of Medicine at the Hershey Medical Center. The project included the extension and modification of the lab gases and electrical services to accommodate the new lab equipment and floor plan.
Design Complete : January 2003
Total Construction Cost : $400,000
Architect : Hiller Speser Associates

 


 

Education

Project Name : Lafayette College – Williams Visual Art Studios
Project Location : Easton, PA

Project Description : Served as MEP consulting engineer for the construction of a new 30,000 square foot instructional art building, with studios and galleries. Services included the design of mechanical, electrical, plumbing, and fire protection systems that were visible and a part of the architecture of the building.
Construction Complete : April 2001
Total Construction Cost : $3,500,000
Architect : Joseph N. Biondo & Buckl Architects (joint venture)

 

Project Name : Benton Area School District – Additions and Alterations
Project Location : Benton, PA

Project Description : Served as MEP consulting engineer for the additions and alterations to the 100,000 square foot Benton Area Junior Senior High School. Mechanical design included the replacement of all existing HVAC equipment with new four-pipe unit ventilators for classrooms, and rooftop and modular type air-handling units for the ancillary spaces. Electrical design included the phased replacement of the primary service from 120/208 volt to 277/480 volt. All new lighting for classroom. New fire alarm, time clock, intercom, phone system, security, and emergency power distribution system.
Design Complete : October 2002
Total Construction Cost : $9,000,000
Architect : EI Associates


Project Name : Bloomsburg Area School District – Additions and Alterations to the Evans and Memorial Elementary Schools
Project Location : Bloomsburg, PA

Project Description : Served as MEP consulting engineer for the additions and alterations to two of the elementary schools for the Bloomsburg Area School District. Mechanical design included the replacement of all existing HVAC equipment with new four-pipe unit ventilators for classrooms, and rooftop and modular type air-handling units for the ancillary spaces. Electrical design included the phased replacement of the primary service. All new lighting for classroom. New fire alarm, time clock, intercom, phone system, security, and emergency power distribution system.
Design Complete : July 2002
Total Construction Cost : $11,000,000
Architect : EI Associates

 

 


Project Name : Syracuse University – New Parking Garage
Project Location : Syracuse, NY

Project Description : Served as MEP consulting engineer for a new 7 story parking garage for Syracuse University.
Design Complete : May 2002
Total Construction Cost : $12,000,000
Architect : Bohlin Cywinski Jackson

 

 


Project Name : Northern Lehigh School District – Middle School
Project Location : Slatington, PA

Project Description : Provide MEP design services for the complete renovation of a 70,000 SF Middle School. Mechanical design included the replacement of all existing HVAC equipment with new four-pipe unit ventilators for classrooms, rooftop energy recovery units for make-up air, and rooftop and modular type air-handling units for the ancillary spaces. Electrical design included the phased replacement of the primary service from 120/208 volt to 277/480 volt. All new lighting for classroom. New fire alarm, time clock, intercom, phone system, security, and emergency power distribution system.
Construction Complete : October 2002
Total Construction Cost : $7,000,000
Architect : The Architectural Studio

 

 


Project Name :
Rodale Child Care Center
Project Location : Emmaus, PA

Project Description : Served as MEP consulting engineer for the construction of a new 13,000 square foot childcare center. Services included the extension of the campus chilled and hot water system to the new building and the design of new lighting and power distribution systems in accordance with the California Energy Code. HVAC system included underfloor radiant heat, and energy recovery equipment.
Construction Complete : January 2001
Total Construction Cost : $2,300,000
Architect : Williams Kinsman Lewis Architecture, P.C.

 

 


Project Name : Lake Lehman School District
Project Location : Lehman Twp, PA

Project Description : MEP Design services for 80,000 SF HS Addition
Construction Complete : 2002

 

 

Project Name : Northern Lehigh School District
Project Location : Slatington, PA

Project Description : MEP Design services for High School Addition and Renovations
Construction Complete : 2002

 

 

Project Name : Carbondale Area School District
Project Location : Carbondale, PA

Project Description : MEP Design services for Elem. School Addition and Renovations
Construction Complete : 2002

 

 

Project Name : MMI Prep School
Project Location : Freeland, PA

Project Description : MEP Design services for Prep School Addition and Renovations
Construction Complete : 2002

 

 

Project Name : Mary Kintz Bevevino Library
Project Location : College Misericordia, Dallas, PA

Project Description : MEP Design for new 30,000 square foot Collegiate Library. Services included design of HVAC system for archives, design of card access and information technology systems.
Construction Complete : 2002

Total Construction Cost : $3,500,000
Architect : Bohlin Cywinski Jackson

 

 


 

Corporate/Commercial

Project Name : Sheraton Headquarters Hotel
Project Location : Atlantic City, NJ

Project Description : Served as an MEP sub-consultant for a Fifteen story hotel and conference center serving new Atlantic City Convention Center. Complete HVAC, plumbing, fire protection, and electrical systems design.
Construction Complete : May 1997
MEP Construction Cost : $18,000,000
Architect : Cope Linder Associates

 

 

Project Name : The Columbia Alliance for Economic Growth – Technology Center
Project Location : Bloomsburg, PA

Project Description : Serving as MEP consulting engineer for the additions and alterations a 30,000 square foot mansion to a Technology Incubator Center for the Bloomsburg Area. The building is on the National Register of Historic Places and all of the MEP & FP systems will be designed and installed to preserve the architectural integrity of the building.
Design Complete : est. February 2003
Total Construction Cost : $3,000,000
Architect : Burkavage Design Associates

 

 

Project Name : Saint Johns United Methodist Church
Project Location : Williamsport, PA

Project Description : Served as MEP consulting engineer for a 10,000 square foot addition and alterations to a Methodist Church. The project included classrooms, nurseries, and music rooms, as well as a boiler plant and electrical service replacement.
Design Complete : February 2002
Total Construction Cost : $1,300,000
Architect : Hiller Speser Associates

 

 

Project Name : Sovereign Performing Arts Center (Formerly the Rajah Theater)
Project Location : Reading, PA

Project Description : Served as Consultant Engineer to the Berks County Convention Center Authority. Provided the design of the upgrade to the MEP systems for the restoration of the 1800 seat Rajah Theater which included the Grand Lobby and Lower Level concession areas, plus four (4) levels of Banquet/Convention facilities totaling approximately 50,000 SF. Design included new central hot and chilled water systems, new HVAC systems for the Theater and Banquet facilities, new Stage, Theater, and Grand Lobby lighting, new fire pump and sprinkler system for the entire facility, complete rewiring of the entire facility, and upgraded plumbing systems to support the nearly 50 additional plumbing fixtures.
Construction Complete : February 2002
Total Construction Cost : $6,500,000
Architect : MOS Design

 

 

Project Name : The Berwick Area YMCA
Project Location : Berwick, PA

Project Description : Served as MEP consulting engineer for the construction of a new 10,000 square foot Natatorium housing a whirlpool and a family recreation swimming pool with a water slide and multiple water toys. Services included the design of new heating, air conditioning, dehumidification, lighting, power distribution, and pool filtration systems.
Construction Complete : September 2002
Total Construction Cost : $2,700,000
Architect : Williams Kinsman Lewis Architecture, P.C.

 

 

Project Name : Marriott Conference and Cultural Center
Project Location : Trenton, NJ Project Description : Served as E&P sub-consultant for this seven story hotel and conference center serving Greater Trenton Municipality.

Construction Complete : June 2002
Total Construction Cost : $30,000,000
Architect : Ford Farewell Mills & Gatch

 

Project Name : The Ohio Air National Guard – New Readiness Center
Project Location : Coshocton, Ohio

Project Description : Serving as Mechanical, Electrical, Plumbing, and Fire Protection Engineers for a new 25,000 square foot Armory. The single-story, slab-on-grade building includes an assembly hall, classrooms, kitchen, lockers, offices, and a truck bay. The building will be design to the Department of Defense guidelines.
Design Complete : December 2002
Total Construction Cost : $3,000,000
Architect : Burkavage Design Associates

Project Name : Geisinger Health System – Executive and Administrative Office Relocations
Project Location : Danville, PA

Project Description : Served as MEP consulting engineer for the conversion of 8000 square feet of open office space to an upscale Executive office suite.
Design Complete : July 2001
Total Construction Cost : $1,500,000
Architect : Francis Cauffman Foley Hoffmann

Project Name : Lucent Technologies – 2D2 Computer Room
Project Location : Murray Hill, NJ

Project Description : Fit-out of a 5000 square foot area for use as a computer research lab including a raised floor and computer room air-conditioning.
Design Complete : February 2002
Total Construction Cost : $600,000
Architect : Burkavage Design Associates

Project Name : Private Residence
Project Location : New Ringgold, PA

Project Description : Served as MEP consulting engineer for the construction of an 18,000 square foot residence. Our services include the design of a geothermal heat pump system, radiant floor heating, and an emergency power system.
Construction Complete : September 2000
Total Construction Cost : $4,500,000
Architect : Bohlin Cywinski Jackson

Project Name: New Recreation Center for Back Mountain Harvest Assembly
Project Location: Shavertown, PA

Project Description: Served as MEP consulting engineers for the construction of a new 16,500 square foot community recreation center. Facility includes new 500+ seat gymnasium, locker room, weight training/aerobic room, racquetball court, dining café, and stage area. Mechanical design include all new HVAC equipment, lighting systems, fire alarm, system, communications systems, security, and emergency lighting system.
Construction Complete: June 2002
Total Construction Cost: 1,400,000
Architect: William Kinsman Lewis Architect, P.C.